Gulberg Residence
2025Gulberg III, Lahore
A three-storey family home now running 94% off-grid with stacked lithium storage and full net metering.
Client saves PKR 1.1M / year
Portfolio · 1250+ delivered
Every project below is live, monitored and outperforming its model. Capacities, locations and savings are real — ask any client.
Gulberg III, Lahore
A three-storey family home now running 94% off-grid with stacked lithium storage and full net metering.
Client saves PKR 1.1M / year
Faisalabad
Rooftop + ground-mount hybrid plant cutting the mill's daytime grid draw by 78% with guaranteed PR of 82%.
Client saves PKR 96M / year
DHA, Lahore
Premium villa installation with black-on-black bifacial panels, invisible cabling and whole-home backup.
Client saves PKR 1.9M / year
Johar Town, Lahore
Carport-mounted array powering 40 classrooms and labs — doubling as shaded parking for staff.
Client saves PKR 14M / year
Multan
Critical-load cold chain facility with N+1 inverter redundancy and 2 MWh of lithium buffering.
Client saves PKR 38M / year
Walton Road, Lahore
Retail complex rooftop delivering peak-hour relief exactly when tariffs — and footfall — are highest.
Client saves PKR 22M / year
…and 1,244 more roofs quietly printing savings.
Want references in your neighbourhood or industry? Just ask — our clients love to talk.
Free survey · 48-hour proposal · Zero pressure
Prefer to talk? +92 300 000 0000