Skip to content

Solar EPC — Lahore · Est. 2016

Own your
power.

Pakistan's engineering-first solar company. We design, install and maintain systems that outlive their warranties — and kill your bill for good.

Capacity installed
Projects delivered
CO₂ offset yearly
Google · 214 reviews
5.0
★ 5.0 Rated on GoogleTier-1 Panels OnlyNEPRA Licensed10-Year Workmanship Warranty1,250+ InstallationsAEDB Certified Engineers42 MW InstalledNet Metering Specialists

Why solar · Why now

Electricity tariffs in Pakistan have more than doubled in four years, and every budget cycle brings another adjustment. Meanwhile Lahore receives some of the most generous solar irradiance on the planet.
A correctly engineered system doesn't just cut your bill — it fixes your cost of energy for 25 years, backs you up through load-shedding, and pays for itself before your third summer.

Grid tariff increase since 2021

Days of sun over Lahore each year

Typical payback on a home system

Panel performance life

What we do

Every engagement starts with engineering, not sales. Explore the service that fits your roof, your load and your ambitions.

01Residential SolarHomes that generate their own power02Commercial SolarCut operating costs, permanently03Industrial SolarMegawatt-scale for manufacturers04Net MeteringSell your surplus back to the grid05Battery StoragePower through every outage06Maintenance & CarePeak output, year after year07Energy ConsultationIndependent, engineering-first advice

Savings calculator

Drag your monthly bill. Our model uses real Lahore irradiance data and current tariffs — the same engine our engineers quote with.

PKR 80,000

Recommended system
10.5 kW
hybrid-ready
Yearly savings
PKR 883,200
at current tariffs
Payback period
1.8 yrs
then free power
25-year net gain
PKR 20,452,500
+ 15.2t CO₂/yr offset

Estimates only — your roof, shading and load profile will refine this. Get the engineered version free, within 48 hours.

Selected work

Residential · Hybrid15 kW

Gulberg Residence

2025

Gulberg III, Lahore

A three-storey family home now running 94% off-grid with stacked lithium storage and full net metering.

Client saves PKR 1.1M / year

Industrial · On-grid2.4 MW

Noor Textile Mills

2024

Faisalabad

Rooftop + ground-mount hybrid plant cutting the mill's daytime grid draw by 78% with guaranteed PR of 82%.

Client saves PKR 96M / year

Residential · Hybrid25 kW

DHA Phase 6 Villa

2025

DHA, Lahore

Premium villa installation with black-on-black bifacial panels, invisible cabling and whole-home backup.

Client saves PKR 1.9M / year

Commercial · On-grid180 kW

City School Campus

2024

Johar Town, Lahore

Carport-mounted array powering 40 classrooms and labs — doubling as shaded parking for staff.

Client saves PKR 14M / year

Industrial · Hybrid850 kW

Multan Cold Storage

2023

Multan

Critical-load cold chain facility with N+1 inverter redundancy and 2 MWh of lithium buffering.

Client saves PKR 38M / year

Commercial · On-grid420 kW

Retail Annex, Packages

2023

Walton Road, Lahore

Retail complex rooftop delivering peak-hour relief exactly when tariffs — and footfall — are highest.

Client saves PKR 22M / year

All 1,250+
projects

The process

A disciplined, engineer-led pipeline. You always know what happens next — and when.

  1. 01

    Audit & Survey

    Day 1–3

    We analyse 12 months of bills and meter data, then survey your site with drone shading capture. No guesswork enters the design.

  2. 02

    Engineering & Proposal

    Day 4–7

    Your system is modelled against real irradiance data for your exact coordinates. You receive a proposal with guaranteed output figures, not brochure numbers.

  3. 03

    Installation

    Day 8–14

    Certified crews install with structural-grade mounting, concealed cable runs and zero roof penetration leaks — signed off by a supervising engineer.

  4. 04

    Net Metering & Handover

    Week 3–8

    We run the DISCO approval process while you're already saving. Handover includes your monitoring app, warranty pack and first-year care schedule.

  5. 05

    Lifetime Care

    Year 1–25

    Remote monitoring watches every string, every day. Cleaning, inspections and instant fault response keep output at its engineered peak.

Client voices

My July bill went from PKR 118,000 to PKR 4,200. The team handled net metering with LESCO completely — I never visited a single office. Genuinely flawless work.
Ahmed RazaHomeowner, DHA Lahore15 kW Hybrid

Google Reviews

5.0

★★★★★

Based on 214 verified reviews from homeowners and businesses across Punjab.

Every review. Unfiltered.

Read them on Google →

Questions

The questions every smart buyer asks before going solar in Pakistan — answered without the sales gloss.

As of 2026, a quality 10kW hybrid system typically ranges from PKR 1.4M to 1.9M installed, depending on panel tier, inverter brand and storage. A 5kW on-grid starts around PKR 650K. We quote after a free load audit so you pay for exactly what your consumption requires — never a padded template system.

Most residential clients reach payback in 2.5 to 4 years at current tariffs; commercial clients attacking peak rates often see under 3. After payback, the system produces essentially free electricity for the remaining 20+ years of panel life.

On-grid systems shut down during outages for safety. Hybrid systems with batteries switch over in under 20 milliseconds — fast enough that computers, routers and medical equipment never notice. We size backup around the circuits you actually need, which keeps costs rational.

Net metering lets you export surplus daytime power to the grid for bill credits. We handle the entire NEPRA/DISCO process — application, wiring inspection, bidirectional meter and final approval. Typical timeline is 4–8 weeks, and you can track every stage in your client portal.

Roughly 60–70 square feet per kW with modern 580W+ panels. A typical 10kW residential system needs about 650 sq ft of shade-free area. Our survey includes drone shading analysis across all seasons, so we never overpromise on a compromised roof.

Free survey · 48-hour proposal · Zero pressure

Prefer to talk? +92 300 000 0000